Diagram 1 shows the interaction between the shear forces parallel and right-angled to the joint. For this, v Rd, must be multiplied with a design factor. If both shear forces occur an interaction is necessary, then the shear force right-angled to the joint (v Rd, ) can only be considered partly.
![hotline nemetschek allplan hotline nemetschek allplan](https://lasopaopolis273.weebly.com/uploads/1/2/6/3/126358356/523871422.jpg)
arranged as a ring beam or other constructive measures (e.g. This tensile force can be transferred via appropriate reinforcement e.g. Values for the design shear resistance parallel to the wall (V Rd,II ) as well as right-angled to the wall (v Rd, ) are as follows: If there are shear forces right-angled to the joint, a tensile force must be considered, which is one and a half times of the transferred shear force. The structural engineer is responsible to design the elements and to prove the joint connection according to the German approval (Z ). Furthermore, the precast units have to be made of normal weight concrete with a strength class of at least C30/37 according to EN 206. Tensile forces in the joint (along the wall) have to be excluded or taken by appropriate static or constructive measures Picture 5 Picture Picture 7 Picture PHILIPP GmbH, Aschaffenburg Technical changes and errors reserved AugustĦ Design and construction The reinforced precast concrete units to be connected must correspond to EC 2.
![hotline nemetschek allplan hotline nemetschek allplan](https://www.allplan.net/wp-content/uploads/2013/12/Hotline_Layer_geladen.png)
Primarily, it transfers static shear loads parallel and right-angled to the wall. 140 Range of applications and examples The Power Box System can be used for almost all connections of reinforced precast concrete wall elements. Picture 4 B500A Ø10 Stirrup Ø8/250 anchoring length acc. Higher joints are possible if the subsequent grouting of the joint is made step-by-step in sections of 3.5 m with a grouting hose. In general, a maximum joint height of 3.5 m is allowed. If shear forces right-angled to the joint have to be transferred the wall thickness must be increased to 18 cm. Dimensions PU Weight S L B H L L 1 54PB PHILIPP GmbH, Aschaffenburg Technical changes and errors reserved August 2018ĥ PHILIPPGROUP Application Geometry of precast unit The reinforced concrete elements must have a minimum thickness of 14 cm. B H S L L 1 L L Picture 1 Picture 2 Picture 3 The Power Box System is optimally harmonised and consists of: The galvanised Power Box including a high-capacity, flexible steel wire rope and a plastic cover High-strength, free-flowing grouting mortar (Picture 3) Table 1: Dimensions of the Power Box Ref.-No. Its simple installation by means of a timber board ensures a practice-oriented application. It is able to transfer shear forces parallel and right-angled to the wall safely into the concrete unit (see page 3). V Rd, V Rd, V Rd, V Rd, 2018 PHILIPP GmbH, Aschaffenburg Technical changes and errors reserved AugustĤ System components Advantages at a glance Flexible connecting elements No complicated rebend required High bearing capacity Shear forces right-angled and parallel to the joint transferable Simple design due to shear force specification per Power Box Cost-optimized due to stackable transport packaging Optimal utilization because of variable number of Power Box per joint Box cover recyclable Stable box cover also suitable for hot bonding Weatherproof box cover German approval System components and dimensions The Power Box System is used for the connection of precast concrete units where a transfer of high loads and a proof for it is required.
#Hotline nemetschek allplan software#
Software solutions The latest design software, animated videos and CAD libraries can always be found under Engineering contact Sales contact Phone: +49 (0) 6021 / Fax: +49 (0) 6021 / Phone: +49 (0) 6021 / Fax: +49 (0) 6021 / PHILIPP GmbH, Aschaffenburg Technical changes and errors reserved August 2018ģ PHILIPPGROUP Content System components. High safety level when using our products Close cooperation with federal materials testing institutes (MTIs), and official approvals for the use of our products and solutions whenever necessary. On-site service Our engineers will be pleased to instruct your technicians and production personnel at your plant, to advise on the installation of precast concrete parts and to assist you in the optimisation of your production processes. Inspection reports For documentation purposes and your safety. Practical tests on site We ensure that our concepts are tailored precisely to your requirements.
![hotline nemetschek allplan hotline nemetschek allplan](https://i.ytimg.com/vi/t5IIhEflMZg/maxresdefault.jpg)
Special designs Customized to your particular needs. 2 Transport and mounting systems for prefabricated building Technical department Our staff will be pleased to support your planning phase with suggestions for the installation and use of our transport and mounting systems for precast concrete construction.